First cost for chilled beam systems!
News
February 26, 2015

First cost for chilled beam systems!

Dry chilled beam systems avoid first costs by providing:

  • minimal casing height resulting in minimal vertical building height
  • smaller duct sizes contributing minimal vertical building height and lower structural costs, plus smaller ducts can result in smaller vertical shaft area allowing for greater net occupied/leasable square footage.
  • minimal coil size
  • elimination of drain pan
  • elimination of drainage line
  • elimination of condensate pump

 

AUTHOR(S)