Subscribe to our Newsletter

Subscribe to follow us via email. Fill in your first and last name, your country and city, your company and your email to receive latest news (daily/weekly/monthly updates), information about new events (seminars, webinars and videos) and notifications about our newest Swegon Air Academy Case Studies straight to your mailbox. Please use English names for your country and city.

Select list(s):


DCV: Load test and VAV control form!
News
February 27, 2015

DCV: Load test and VAV control form!

We recommend an automated load test with minimum and maximum supplied airflow rate to all the rooms for maximum and reduced AHU load conditions.

If it is not possible to perform an automated load test because of the chosen components and or programming, we recommend checking all the rooms by measuring the airflow rate for maximum and minimum fan speed, for maximum and reduced system load. This control test should be documented with a completed VAV control form.

In buildings with many rooms with similar function, a random sampling according to the EN 12599 standard can replace the complete load test.

Source guidebook SINTEF Research 24 Demand-controlled ventilation – requirements and commissioning